01
DEMONSTRATED

Two-radio dual-band traffic

Two dedicated receivers operate simultaneously: one monitors 978 MHz UAT and the other monitors 1090 MHz Extended Squitter. Both were demonstrated while moving.

02
DEMONSTRATED

Built-in GPS + EFB delivery

Continuous moving 3D GPS, GDL 90 traffic and actual EFB ownship display demonstrated.

03
DEMONSTRATED · LIMITED

FIS-B ground station

FIS-B ground-station reception demonstrated. Additional weather-product validation is ongoing.

04
ROAD TEST COMPLETE

125.01-mile mobile system test completed

The test demonstrated dual-band receiver operation, continuous GPS, GDL 90 traffic delivery, FIS-B ground-station reception and logging continuity. It does not establish a guaranteed reception range.

05
IN PROGRESS

Custom Rev A carrier + final enclosure

Current work includes final internal antenna design, power-input design, passive thermal management, carrier-board development, enclosure refinement and production mechanical design. The custom Rev A carrier and final enclosure remain under development; hot-environment and final thermal qualification are not complete.

06
INITIAL QUALIFICATION PASSED

Engineering evaluation platform + manufacturing preparation

The engineering evaluation assembly passed initial qualification for core software, the full USB stack and 100-cycle abrupt-power recovery testing. Rev A carrier design is beginning. Component identities, schematics, internal connections and implementation details remain in engineering documentation.

07
ENGINEERING DEMONSTRATED

Abrupt-power recovery + release validation

The engineering evaluation assembly completed 100/100 externally switched abrupt-power cycles with automatic recovery and no customer intervention. Final Rev A carrier-board power testing, broader EFB/FIS-B testing, final packaging and production checks remain before release.

November 2026 development update

Our manufacturing partner confirmed it would begin production on the first batch of 50 Rev A carrier boards. We’re refining the enclosure and cradle and checking that we can produce parts consistently. Once the boards arrive, we’ll check fit and test complete units. Orders will open after the units pass final checks.